Conference Note
With the completion of six new WWTPs (2015-2018), the total treatment capacity will reach approximately 573 000 P.E. or around 27 % of the required capacity in the country. Within Sector Operational Programme for Environment and Climate (2014-2020), are proposed to be constructed at least two other WWTPs which means the treatment capacity in the country would raise for 210.000 P.E. bringing the total capacity to approximately 784.000 P.E. or around 37.3% of the total required capacity.
The Challenge is then to secure operational stability of the WWTPs not only from technical but also from financial point of view.
Going towards this goal by active exchange between all the shareholders such as public utilities, governmental institutions and universities is the aim of the Conference.